My gawd when did I get so busy. In three days I finished a drywall repair job (yes begrudgingly I did some drywall work), continued with my coffee table base, received a commission for a coffee table, was asked for an estimate on a deck and a fence, a estimate for a concrete slab and preliminary design and research for a home I am helping to design. This means I have been spending more time at the drafting table and computer then I have in the shop.
The work in the shop is going very well. I am currently building a large slab coffee table. I have designed and engineered it myself (with some suggestions from Ron). I went through a few design mock-ups, sketches and drafts, but now the solid walnut version is coming together and looks fantastic.
Getting the 12 legs to fit into the trestle stretcher takes a lot of patience and accuracy to get a tight fit.
Cheers
Hans Christopher
No comments:
Post a Comment